NYC remodeling contractor specializing in high-end kitchen, bathroom, and apartment renovations across New York City.
More than two thirds of the apartments in Manhattan are co-ops, and renovating one is not the same job as renovating a house or a condo. You do not simply own four walls and do as you like inside them. You own shares in a corporation that owns the building, and the corporation gets a say in what you do to its property.
That single fact shapes everything: what you are allowed to change, how long it takes to get started, who has to sign off, what insurance is required, which hours your contractor may work, and how the building is protected while the work happens. Gurri Remodel has been renovating co-op apartments across Manhattan and Brooklyn since 1997, and handling that process is part of the job we do for you rather than something we hand back to you.
A contractor who mainly works in houses can be excellent at building and still make a co-op renovation go badly, because the constraints are administrative as much as technical.
In a co-op you are working inside a live building. Your neighbours are home. The service elevator is shared and has to be booked. There are hours when nobody may work at all. Materials cannot simply be dropped at the kerb. The building superintendent and the managing agent both have standing to stop the job. And before any of that, a board of directors has to approve the plan.
The technical constraints follow from the building’s age and construction rather than from your preferences: where the plumbing risers run, how much slope is available for a waste line, what the electrical service can carry, which walls are structural, and what the floor assembly will allow. A good co-op renovation starts by finding out what is genuinely possible in your specific building, then designing within it — not by drawing something beautiful and discovering later that it cannot be built.
The alteration agreement is the contract between you and the co-op corporation that sets out what you may do, who is responsible for what, and what happens if something goes wrong. Nearly every co-op in New York requires one before any work begins, including for renovations that do not move a single pipe.
A complete submission usually includes the scope of work, drawings, your contractor’s licence and insurance certificates, a construction schedule that respects the building’s permitted hours, and often a letter from an engineer or architect where plumbing or structure is affected. Some buildings ask for a security deposit against damage to common areas. Some require the contractor to be approved separately from the plan.
We assemble that package and submit it, then deal with the managing agent directly through the review. Boards typically take two to six weeks to respond to a complete submission, and some review only at monthly meetings. The most common cause of delay by a wide margin is an incomplete package that comes back with questions — which is why we submit everything at once rather than in stages.
Insurance is where a lot of co-op renovations stall, and it is entirely avoidable. Buildings generally require certificates of insurance showing general liability, workers’ compensation and often umbrella coverage at specified limits, with the co-op corporation, the managing agent and sometimes the building’s own entity named as additional insured on the policy.
Naming a party as additional insured is not the same as simply listing them on a certificate, and buildings increasingly check. Gurri Remodel is a licensed and insured New York City general contractor, and producing correctly worded certificates for your building is routine work for us rather than a scramble at the point the board asks.
Work hours. Most Manhattan and Brooklyn co-ops permit construction on weekdays only, commonly between 9am and 4pm or 9am and 5pm, with nothing at weekends or on holidays. Some buildings additionally prohibit noisy work — demolition, tile cutting, coring — outside a narrower window. A schedule that assumes a normal working week will be wrong, and the difference compounds across a project.
Elevator and delivery coordination. In most buildings there is one service elevator, it must be booked in advance, and it is shared with every other resident and contractor. Cabinetry, stone slabs, appliances and debris all move through it. Deliveries have to be scheduled rather than simply arranged with a supplier, and a slab that arrives on an unbooked morning may sit on the pavement or go back to the yard. We plan procurement around the building’s elevator calendar, and we protect the cab, the corridors and the lobby before anything moves.
Protection and clean-down. Buildings expect common areas to be left as they were found, every day. Floor protection, corridor masking and daily clean-down are not optional extras; they are usually written into the alteration agreement, and they are among the first things a superintendent will raise if they slip.
Wet-over-dry. Many co-ops prohibit placing a new wet area — a bathroom or kitchen — above a neighbour’s dry area such as a bedroom or living room. If your plan moves a bathroom or adds a powder room, this is the first rule to check, because it can rule out a layout entirely no matter how well it works on paper. It is also the rule most often discovered too late.
Sound attenuation. Co-ops routinely require a documented sound-attenuation underlayment beneath any hard flooring, specified to a minimum impact-insulation rating, and many require the product data to be submitted with the alteration package. In a bathroom this has to coexist with the waterproofing and with the finished floor height at the door threshold. Getting the build-up right on paper before demolition is what stops a floor finishing an inch too high.
Kitchens are the most requested co-op renovation and among the most constrained. The room is usually small, the riser positions are fixed, and the electrical service was designed for a era of far fewer appliances. Moving a sink or dishwasher means moving supply and waste lines, and how far they can move depends on the slope available back to the stack and on whether the space below is wet or dry.
Within those limits there is a great deal that can be done: taking cabinetry to the ceiling rather than trimming out the gap, scribing runs to walls that are rarely plumb, adding dedicated circuits for modern appliance loads, and choosing surfaces that suit how the room is actually used. Our kitchen remodeling page covers the materials and sequencing in more detail.
Bathrooms are the scope co-op boards scrutinise most closely, because a bathroom failure damages the apartment below and the corporation carries the consequence. Expect a closer read of your submission, and often a requirement for a plumber’s letter or an engineer’s sign-off where the waste line is altered.
The work that matters most is invisible when finished. A tiled shower is not waterproof; the membrane behind it is. We build a continuous membrane across the floor, up the curb and onto the walls above shower-head height, seal every corner and penetration, and flood-test the pan before any tile is set. Where the building wants the test documented, we document it. Our bathroom remodeling page explains the full sequence.
A full co-op apartment renovation is a coordination problem as much as a construction one. Every trade has to move through one elevator, inside fixed hours, in a building where people are living. The board package is larger, usually requiring architect’s drawings and an engineer’s letter, and the review takes correspondingly longer.
Most clients move out for a full-apartment job. It is faster, it is safer, and it removes the daily friction of living without water or power in part of the apartment. Where staying is unavoidable we phase the work to keep a bathroom and a kitchen area usable, at the cost of a longer overall programme. Our full apartment renovation page sets out what the scope covers.
We take the administrative weight off you and keep the job inside the building’s rules.
Our process page sets out what happens at each stage, from first conversation to handover.
Recent work in Manhattan co-op and apartment buildings:
Many of these sit in older buildings with their own particular constraints. If yours is one of them, our pre-war apartment renovation page goes further into working with original plaster, trim and infrastructure.
It is the contract between you and the co-op corporation covering the work you intend to do. It sets out the approved scope, who carries responsibility for damage, the insurance the building requires, the hours work may take place, and what happens if the job overruns or something goes wrong. Nearly every co-op requires a signed agreement before work begins, including for renovations that do not move plumbing.
Typically two to six weeks from the day a complete package is submitted. Some boards only review at monthly meetings, which can extend it. The most common cause of delay is an incomplete submission, so we send drawings, scope, licence and insurance certificates together rather than in stages.
Yes. A board can refuse a plan outright, or approve it subject to conditions. Refusals usually come down to something the building does not permit — moving a wet area over a neighbour’s dry room, altering a structural element, or changing something that affects the building’s systems. This is why we read the house rules before anything is designed.
It depends on scope. Cosmetic work usually does not. Anything touching plumbing, electrical service, structure or layout typically requires drawings, and many buildings specifically require a letter from a licensed engineer or architect where the waste line or any structural element is affected. We tell you which category your project falls into early.
General liability, workers’ compensation and often umbrella coverage at limits the building specifies, with the co-op corporation, the managing agent and sometimes the building entity named as additional insured. Buildings increasingly verify that parties are genuinely named as additional insured rather than simply listed on a certificate.
Sometimes, and it depends on the waste stack. A toilet needs a specific drain size and slope back to the stack, which makes it the hardest fixture to relocate. Sinks and showers are more flexible. We check what your building’s plumbing actually allows before designing a layout around it.
Many co-ops prohibit placing a new wet area — a bathroom or kitchen — above a neighbour’s dry area such as a bedroom or living room. If your plan relocates a bathroom or adds a powder room, this rule needs checking first, because it can rule out a layout entirely regardless of how well it works otherwise.
For a single kitchen or bathroom, often yes, though a one-bathroom apartment becomes difficult when that bathroom is out of service. For a full apartment renovation most clients move out; it is faster and safer. We will tell you honestly which situation you are in before you make arrangements.
Around eight to twelve weeks on site once the board has approved the work and materials have arrived. The construction window is often not what sets the overall timeline — board review runs two to six weeks, and custom cabinetry and stone commonly take six to ten weeks from order. We order long-lead items during board review so those periods overlap.
Around six to ten weeks on site after board approval, plus the review period and the lead times on stone, vanities and glass beforehand.
Yes. We prepare and submit the alteration agreement package, produce the insurance certificates naming the parties your building requires, coordinate with your architect or engineer where their sign-off is needed, and deal with the managing agent directly until the work is approved.
Most buildings permit construction on weekdays only, commonly 9am to 4pm or 9am to 5pm, with no weekend or holiday work. Some restrict noisy work to a narrower window within that. We build the schedule around your building’s specific rules.
If you own or are buying a co-op in Manhattan or Brooklyn, tell us the building and roughly what you have in mind. We will tell you what is realistic before you spend anything on drawings — including what your board is likely to ask for.
Request a consultation, or read more about everything we do and what our clients say.
Own a condominium instead? Our condo renovation page explains how condo board approval and alteration agreements differ from the co-op process described here.